MRIDC has invited bids for construction of cable stayed road-over-bridge in Mumbai

MRIDC has invited bids for construction of cable stayed road-over-bridge in Mumbai

Maharashtra Rail Infrastructure Development Corporation has invited bids for construction of cable stayed road-over-bridge in Mumbai.

The scope of work includes construction of cable stayed road-over-bridge (RoB) at existing RoB location between EP/19/156 and EP/20/1 between Ghatkopar and Vikhroli station in Mumbai division of Central Railway.

The estimated value of the project is Rs 145 crore.

here is company details.

 

NOTE :You need to login first to access this feature.

Leave a Reply

Your email address will not be published. Required fields are marked *